Model text of water supply contract in the hottest

2022-09-22
  • Detail

Model text of urban water supply contract (model text)

Contract Number:

place of signing:

time of signing:

water supplier:

water user:

in order to clarify the rights and obligations of the water supplier and the water user in the supply and use of water, according to the contract law of the people's Republic of China This contract is entered into by and between the water supplier and the water user through consultation in accordance with the urban water supply regulations and other relevant laws, regulations and rules

Article 1 water use address, water use nature and water consumption

(I) water use address is. The scope of water use (i.e. the boundary around the water user area) is (the detailed drawing can be made as an attachment)

(II) the nature of water use is water use, and the price of water supply shall be implemented

(III) water consumption is cubic meters/day Cubic meter/month

(IV) the installation location of the billing master water meter is: () (the detailed drawing can be formulated as an attachment)

(V) a total of meters with registration number are installed

Article 2 water supply mode and quality

(I) within the validity of the contract, the water supplier will provide uninterrupted water supply to water users through urban public water supply pipes and ancillary facilities

(II) if the water user cannot use water intermittently or has special requirements for water pressure and quality, Cui Xiaofeng, an engineer of BAIC Motor Corporation Limited, should set up water storage, indirect pressurization facilities and water treatment equipment by himself

(III) the water supplier shall ensure that the water quality of urban public water supply pipes meets the national sanitary standard for drinking water

(4) the water supplier shall ensure that the water pressure at the billing master water meter is greater than or equal to megapascal; If it is charged by household meter, ensure that the water pressure at the valve before entering the building is greater than or equal to megapascal

Article 3 water measurement, water price and water fee settlement methods

(I) water measurement

1 The measuring instruments for water use are: meter IC card meter; Or. The installation shall be registered. The amount of water measured by both parties in accordance with the registered billing water meter shall be used as the basis for the settlement of water charges

the measuring instruments used for settlement must be verified and recognized by the local technical supervision department

2. Water for human consumption shall be measured by classification according to the nature of water use. When water with different water uses share a billing meter, the water supplier shall calculate and charge water fees according to the highest water price or divide the water consumption with different water uses by proportion

(II) water supply price: the water supplier shall collect water charges according to the nature of water used by the water user and the water supply classification price approved by the government (Department)

during the validity of the contract, in case of water price adjustment, it shall be implemented in accordance with the provisions of the price adjustment document

(III) water fee settlement method

1 The water supplier shall check the table and settle the water charge according to the specified period, and the water user shall pay the water charge before the day of month

2. The water fee settlement adopts the method of

Article 4 property right demarcation and maintenance management of water supply and use facilities (I) the demarcation point of property right of water supply and use facilities is the general water meter designed and installed by the water supplier. Those charged by household meter are at the valve in front of the building

(II) the water supply person is responsible for the maintenance and management of the pipelines and ancillary facilities at the water source side of the property right demarcation point (including the billing water meter). The water user shall be responsible for the maintenance and management of the pipelines and facilities on the other side of the property right demarcation point, or entrust the water supplier with maintenance and management with compensation

Article 5 rights and obligations of the water supplier (I) supervise the water user to use water according to the water quantity, nature and scope agreed in the contract

(II) if the water user fails to pay the water fee within the time limit, the water supplier has the right to charge the water user a late fee from the date of expiration

(III) if the water user moves or no longer uses the billing water meter and water supply facilities for other reasons, and has not gone through the transfer procedures, the water supplier has the right to dismantle its billing water meter and water supply facilities

(IV) if the water meter cannot be copied and tested due to the occupation and damage of the water meter well and the water user, the water supplier can estimate the water charge of this period according to the maximum monthly water consumption of the last month. If the water user cannot solve the problem of hindering the meter reading and inspection within three months, the water supplier will not refund the over estimated water fee

(V) the water supplier shall provide uninterrupted water supply in accordance with the water quality agreed in the contract. The water supplier shall supply water at the pressure specified in the contract, except that the water supply capacity is insufficient in peak seasons and the pressure is forced to be reduced with the consent of the urban water supply administrative department. The water user shall be informed 24 hours in advance of the water cut-off caused by planned overhaul, maintenance and new pipe construction

(VI) it is not easy for the water supplier to master the establishment of special services to accept the repair requests of water users 24 hours a day and night. In case of damage to water supply pipelines and ancillary facilities, the water supplier shall enter the site in time for emergency repair

(VII) if the water supplier needs to change the water meter reading and inspection and the charging period, it shall notify the water user one month in advance

(VIII) if the water meter proposed by the water user is inaccurate, the water supplier is responsible for rechecking and verifying. If the water meter stops or breaks due to natural damage, the water supplier shall replace it free of charge. The water supplier can estimate the water charge of this period according to the average water consumption of the water user in the last month. The water charge overcharged due to the wrong meter reading by the water supplier and the inaccurate measurement of the billing water meter shall be refunded

Article 6 rights and obligations of water users (I) supervise the water supplier to supply water to the water user according to the water pressure and quality agreed in the contract

Jinmin new material is a technology-based company focusing on the research and operation of high-end new material industry (2). It has the right to require the water supplier to conduct periodic verification of billing water meters in accordance with national regulations

(III) have the right to propose to the water supplier to review and verify the billing water meter

(IV) have the right to apply for review of the water charge collected by the water supplier and the determined water price

(V) the water fee shall be paid to the water supplier on schedule in accordance with the contract

(VI) guarantee the charging water meter, meter well (box) and

Copyright © 2011 JIN SHI