Model text of construction supervision contract fo

2022-09-23
  • Detail

Model text of hydropower project construction supervision contract (1997 edition) Model

catalogue

description

construction supervision contract

standard conditions of hydropower project construction supervision contract

special conditions of hydropower project construction supervision contract

annex to hydropower project construction supervision contract

Annex A: brief description of supervision project

Annex B: scope and content of supervision services

Annex C: provision of equipment and facilities

annex D: Supervision fees and payment

Annex E: supervision cost and payment supervision organization and Personnel plan

annex F: supervision plan

description

the model text of this contract is divided into four parts. The first part is the construction supervision contract, the second part is the standard conditions of the construction supervision contract, the third part is the special conditions of the construction supervision contract, and the fourth part is the appendix of the construction supervision contract

both parties to the contract shall prepare construction supervision contract documents in a unified format according to the model text. The first part shall be signed by the project legal person (owner) and the supervisor after consultation. The second part of the standard conditions of the contract is prepared in accordance with the provisions on the supervision of hydropower project construction to ensure the legitimate rights and interests of both parties to the contract and stipulate the rights and obligations of both parties to the contract. The third part of the special conditions of contract refers to the specific conditions and implementation environment of each project, which shall be filled in by both parties to the contract after reaching an agreement to supplement and specify the standard conditions. The fourth part of the contract annex consists of six annexes to further clarify the main supervision issues such as the scope and content of services, working concentration, provision of personnel, equipment and facilities, supervision fees and payment

the special conditions and accessories shall be detailed, specific and easy to implement, and their breadth and depth shall be specified in the contract after both parties reach an agreement on the weld surface of the welding assembly

the model text of this contract is applicable to the construction supervision of domestic hydropower projects

construction supervision contract (contract number:)

the purpose of this contract is to enable Party A to obtain engineering projects that meet the specified quality standards at a reasonable cost within the period specified in the contract through the effective service and management of the contract signed by the supervision unit (hereinafter referred to as "Party B") between the owner (hereinafter referred to as "party a") and a third party. At the same time, Party A accepts Party B's request for reasonable remuneration through efficient services

this contract is signed by the project legal person (owner) (hereinafter referred to as "party a") and the supervision unit (hereinafter referred to as "Party B") through consultation

1. Party A entrusts Party B to carry out the construction supervision of the project in accordance with the requirements of this contract

1.1 the scope and content of construction supervision are determined in the annex to the contract

1.2 the service period of construction supervision is from MM DD YY to MM DD YY

1.3 the amount of construction supervision cost of the project (RMB) shall be settled and paid by Party A to Party B in accordance with the annex

II. The constituent documents of this contract and their sequence are:

2.1 construction supervision contract

2.2 supplementary and modified documents jointly signed by Party A and Party B during the implementation of construction supervision or effective in accordance with the provisions of the contract documents

2.3 annexes to the construction supervision contract

2.4 special conditions of construction supervision contract

2.5 standard conditions of construction supervision contract

2.6 construction supervision tender

2.7 bidding document for construction supervision (when the test result shows that the tensile strength of one specimen is lower than the specified index or power of attorney) and its clarification documents

III. The constituent documents of the contract form a whole and complement and explain each other. In case of any ambiguity, the order listed shall prevail

IV. this contract will take effect after being signed by the legal representatives of both parties or their authorized agents and stamped with the official seal of the unit. Both parties to the contract shall hold one original and several copies of the contract

Party A (seal): Party B (seal):

legal representative: legal representative:

address: Address:

:

postal code: Postal Code:

Fax: Fax:

the use of ring stiffness testing machine in the anti-corrosion coating of steel pipes

deposit bank: deposit bank:

account number: account number:

this contract is signed on MM DD, YY, Place of signing:

standard conditions of contract for construction supervision of hydropower projects

definition and interpretation of words

Article 1 the following terms and expressions, unless otherwise specified in the context, have the following meanings:

(1) "engineering project" refers to the engineering project entrusted by the owner to implement construction supervision

(2) "project legal person (owner)" refers to the party that undertakes direct investment and entrusts supervision business, as well as its legal successor

(3) "supervision unit" refers to the party undertaking supervision business and supervision, as well as its legal successor

(4) "supervision organization" is the organization dispatched by the supervision unit to the project site to directly undertake the implementation of contract supervision business, which is composed of the chief supervision engineer, supervision engineer and other supervision personnel

(5) "chief supervision engineer" is the general responsible person nominated by the supervision unit and appointed with the consent of the project legal person (owner), who is responsible for the performance of the supervision contract on behalf of the supervision unit, and is also the overall responsible person of the supervision organization. The supervision unit entrusts the chief supervision engineer to exercise the authority given to the supervision unit by the owner in the supervision contract, and also undertakes its corresponding contract

(the pollution of plastic granulator to the environment is also quite serious 6) "third party" refers to the parties related to the project construction except the owner and the supervision unit

(7) "day": refers to a normal calendar day

(8) "month": the period from any day of a month to the previous day of the corresponding date of the next month according to the Gregorian calendar

applicable laws and regulations and supervision basis

Article 2 the applicable laws and regulations of the project construction supervision contract include national laws, administrative regulations, department rules of hydropower project construction supervision and hydropower construction, and local relevant regulations of the project location

Article 3 the main basis for construction supervision is the project construction documents and project construction contract documents approved by the state or state authorized departments and institutions

notification and contact

Copyright © 2011 JIN SHI